Saturday, February 20, 2010

What Kind Of Pants Should You Wear Rock Climbing

sampling

On 08 February we went to Vechta and wages for sampling.
That was a nice hard day, but we loved. Finally something nice in between!
Our schedule for the day was full. It started at 10 clock at the company Riesenbeck, there we have the windows, interior doors and a front door showing
The windows are quite simply in white. In the interior doors we have chosen real wood doors in beech. Our front door is white with a long glass plate with a narrow side of glass. We were there very well advised.

then we've also had the next appointment with J + H Fahling, which was the largest tile business we have ever seen.
There we were also very good advice. First, we have allowed ourselves some floor tiles for the EC show. After a short time we had chosen for a cream-colored in oblong format, then we have selected tiles for the guest bathroom, where we have decided also to off-white wall tiles, because of the contrast it to the floor tile to fit, as a highlight we have there a border planned in mosaics!
For the Bathroom on upper level we have chosen an anthracite-colored tile floor and wall tiles, we have chosen white, so it is not too dark, both tiles are 30x60 in size. We are looking forward to performing!

we had right after the next appointment on the issue of sanitation company Frieling.
We were already expecting the friendly adviser of the house has shown us the first basin of the building company, after which the toilets are in the price of it. We agreed, satisfied with the sanitation of the building company. The nice saleswoman showed us the bath is in the price of it, but these are not gefiehl two so as it has shown us other tubs in various price ranges, we now have to pay a little on it but that is our business! Shower base is very deep, so we wanted to, unfortunately the package is not a shower with it.

The last time we had at GR.Beilage, where we have chosen tiles, charcoal colored engobed tiles. This we have done
fastest! Then we made our way home, on the whole the day was exhausting but beautiful.

Tuesday, February 9, 2010

Skype Wont Detect Camera

Contractors

We have asked our architect, we provide a single craft tender.
He has presented to us in December, still not a complete home range, we are determined to seek their own bids.
Anfang Januar trafen wir uns mit einigen Bauunternehmungen am Ende kamen drei in unserer engeren Auswahl. Die Firma Hausimpuls unseres Doppelhauspartners war auch in der engeren Auswahl, vom Preisleistungsverhältnis waren alle drei sehr ähnlich.
Die Firma Hausimpuls ist es dann geworden.
Für uns ist es die beste Lösung, dass ein Doppelhaus aus einer Hand gebaut wird, darin sehen wir weniger Probleme.
Ende Januar haben wir den Vertrag mit der Firma Hausimpuls unterzeichnet, worüber wir uns sehr freuen.
Sobald der Bauantrag genehmigt ist und das Wetter es zulässt werden wir sofort loslegen.

Nba 2005 For Megauplad

duplex Partners & building application

Da wir ja noch keinen Doppelhauspartner hatten, haben wir einige Anzeigen im Internet set so as to find a partner, unfortunately without success.
In December we will then get a very good news from our lenders that he wants to plan his semi-detached house next to us as a model house. The course was very congenial to us, there ended in 2009 but still enjoyable and we were very relaxed Christmas celebration. Our duplex partner has completely taken over our external design. The architect then has quickly drawn the plans and made everything ready for the planning application. All our stuff for the planning application had now been produced, since the planning application in 2009, we still wanted to make, from power because of the new Directive 2010.
mid-December, we will together in the SER place to discuss the planning application, except for a few little things, the SER approved our plans.
We have the planning application on 14.12.2009 is right.
end of December, we then get the receipt, unfortunately the application was missing some documents.
early January I had an appointment with the Building Department, there I was after a long discussion explains what documents were still missing.
I have immediately taken care of all the documents, so we do not lose any more time. On 25 January, we have met with the architect at the construction office and hand over all remaining documents.
So far we heard nothing since the person in charge of building authority, unfortunately become ill.
I think we will still have to have patience, pending approval.