Friday, May 21, 2010

Is There Any Difference In Printer Ink

Days Heritage Days






There is still a little around it, but slowly you get an impression of how the house might look like once completed. In the north there will be a wooden extension which carport, storage areas and the garden a Pergola will include that gradually silver will weather. The aim of the color, it is the house with its surroundings in the middle of downtown to merge conservation area
. On the ground floor, it is already imagine the feeling of spaciousness flowing space.
kitchen, dining area and living room are only a few steps and narrow pilasters divided. The underside of the Glulam ceiling
will remain visible as area wooden ceiling. as of December 2009

Thursday, May 6, 2010

Hurts Swallow Stiff Neck

starts it, the floor was delivered




Am Mittwoch hat meine Arbeitskollegin mit mir das Grundstück eingemessen und abgeflockt, damit die LKWs, die den Boden anliefern genau sehen wo unser Grundstück liegt. Donnerstag früh war es dann endlich soweit der erste LKW mit Bodenladung kam pünktlich ran gefahren, wir haben ihn vor Ort die Markierungen angezeigt, so das nichts schief gehen kann. Mein Arbeitskollege hat kurz nach dem abschütten den Boden control, he is satisfied with the ground, nothing could be better. We are very happy because we have unfortunately heard so much. I had my doubts because we have been asked to land at an affordable price. Afternoon, we met on site with the excavator operator to discuss the further details. Since it is raining since yesterday, unfortunately, through the floor of the excavator operator can no longer condense this week, but the main thing is that it happened at last something.