Sunday, August 29, 2010

Smoking Damiana Vs Tea

Already the walls are the walls

























































Now come the walls!

Finally, the walls are already on the ground and soon the ceiling ... spilled!
Meanwhile, we have already bought a large garden shed. There are we need to bring some things from our current rented basement. Unfortunately, our new no basement and only have a small attic. The attic will be high at its highest point 1.75m. This is because the ridge height is limited in our development area or in the relevant development plan to 8m. We find this a shame, otherwise we would have built our house much higher and increased the attic.
But well before we can now set up our house and bought in garden (formerly a model home), we still have times of the great mountain behind our Mother Earth distribution (almost) shell and leveled. In this distributed world we can then use the garden shed stellen. Wir haben jetzt auch die Stahlplatten vor unserem Grundstück vom Erdbauunternehmen Heim entfernen lassen. Diese sollten ja als Überwegung für schwere LKW´s dienen und den Bürgersteig vor Beschädigungen schützen. Die wöchentliche Leihgebühr von 40Euro netto empfanden wir als Wucher und außerdem benutzt kein Bauherr in unserem Baugebiet vor seinem Grundstück solche Stahlplatten. Und die Bürgersteige werden trotzdem nicht beschädigt. Die Stahlplatten sind letztendlich nur wichtig, damit unsere Baufirma Team Massivhaus bei Beschädigungen des Bürgersteiges durch schwere LKW´s jegliche Verantwortung von sich weisen kann. Aber wir haben unserer Baufirma schriftlich bestätigt, dass wir nun, da die Platten ja weg sind, jegliche Verantwortung für Beschädigungen des Bürgersteiges durch Baufahrzeuge übernehmen. Aber man kann auch positiv über die Fa. Heim vermerken, dass diese unser Haus etwas angehoben hat. Da ja hinter unserem Haus das Grundstück abschüssig ist (also ein kleines Gefälle besteht), hat das Erdbauunternehmen etwas mehr Kies (oder auch Sand) unter das Fundament geschüttet, als wir eigentlich dachten. Damit wurde unser Haus etwas angehoben. Somit liegt das restliche Grundstück nicht höher als unser Fundament.

Monday, August 23, 2010

Sleeping With A Scorpio

has begun!




On 08/20/2010
has finally begun after four days of rain break, the company Maurer TF to support our house walls. This company in turn is a subcontractor of the company team massive house.

Thursday, August 19, 2010

How To Disguise Ugly Pipework

The roofer is there


yesterday came at last, the roof, through the whole rain in the last day, our house has become quite wet. Now the film is
on it, which we are very happy.
are still supplied the tiles. Hopefully not so late, so they can start yet.
the weekend will be covered the roof. :-)
Furthermore, I had this morning the appointment by the window manufacturer, who came to the oversize. In about 2.5 - 3 weeks we will get the window.
Then our house so far closed. Finally
Thomas uses any free time for the electrical installation. Next weekend he will also prepare the finished floor.

Monday, August 16, 2010

Rape In The Bus Japan



8/13/2010 The sole is laid

the sole with the associated connection pipes has now been now published as well.

Sunday, August 15, 2010

Can I Mix Dr Miracleproducts

roof & Topping








Last week Thursday the company began Klüsener, the carpenter with our roof.
few days before I talked to the head of the company that we can by the carpenter get a nice topping.
We wanted to celebrate a very official topping out with our family, our friends and acquaintances.
On the day of the topping-out ceremony, we have decorated a birch crown and brought to the house, so the carpenter can install it.
After all the preparations we are then moved together to build when we arrived there was the big shock, the carpenters were no longer on site.
Initially we thought that they will come back when 17 clock was set.
But unfortunately, no clock at 17.30 to see a carpenter. All our guests were already there, we were very angry about it, have tried several times by phone to reach the carpenters, but to no avail!
Thomas has made the birch on the roof, as this did not make people too. As our guest
have joined forces and planned a speech, and they wanted to spend the day can be spoiled. A good friend is then sent us up, my mother and Fabian have saved it then great, thank you very much, that was really a pleasant surprise. The carpenters could not make it better.
We also have very happy that, my mother was put forward very personal for us. I even came to tears. We had a wonderful topping, even without a carpenter.
Thank You all were there and the beautiful for the many gifts.

Sunday, August 8, 2010

Treatment Inhalation Of Bleach




Let's go!

At 2:08:10, we had our Bauanlaufgespräch with our construction manager, a bricklayer, and with a staff of Erdbauunternehmens home on our property. After the yes we jumped in advance of our familiar Erdbauunternehmer Thode from Rothbau (Because of job overload), we can now undertake the Erdbauunternehmen home. This company will carry out the earthworks for us under our planned home and planned to dig the driveway to our house. This Erdbauunternehmen we have chosen, because its services appear to us over the cost estimates from other Erdbauunternehmen as cheap. And, the estimate of this Erdbauunternehmens been made very professionally (with many different detaliiert. Cost points). Unfortunately, we have overlooked in this estimate, that cost us the steel plates that are used by construction vehicles as access roads to our planned house, 40 Euro per week. This price seems to be totally covered. Therefore we are looking for us now, another distributor of steel plates. The Erdbauunternehmen then has also agreed excavated at 5:08:10 planned under our house up to 1m depth of mother earth and dug a driveway. This driveway was then filled with recyclable. The huge hole in our planned house was then filled with gravel. The dredged mother earth we have spread across our land. Unfortunately, our land is not at ground level, but slightly sloping. This deficiency will be compensated with the embankment of Mother Earth.
In addition, we also have a Bustromkasten for the entire construction period and will be rented at Stadtwerke ein Standrohr für Bauwasser ausleihen. Dieses Standrohr werden wir dann persönlicch dem Maurer übergeben, der dann am 10.08.10 beginnt, das Fundament bzw. die Sohle zu schütten. Schließlich fangen wir jetzt auch damit an, uns Fliesen auszusuchen, die dann von dem Fliesenleger unserer Baufirma verlegt werden. Unser Bauunternehmen verlegt leider nur in bestimmten Räumen im Haus Fliesen (z.: im Bad, im Flur, in der Küche und im Gäste-WC). Die in diesen Räumen verlegten Fliesen und auch die Kosten des Verlegens sind im Hausbaupreis enthalten. Mehr wird von unser Baufirma nicht übernommen. In den restlichen Räumen (wie den Schlafzimmern und in dem Wohnzimmer)müssen wir den Bodenbelag auf eigene Kosten kaufen u. verlegen (= Own work). Our house will have an area of about 140 sqm (total gross of the roof slopes) with a ground floor and an attic. We are in our house do the following premises:
- A living room
- 1 children
- 1 study
- A family bathroom
- a guest
- a guest room
- a utility room
- one bedroom
- a kitchen
- a utility room
- a corridor

Our house is heated with a geothermal heat pump with a 185 liter water tank and underfloor heating. We will also build into our house a development and Beluftungsanlage without heat recovery. This decentralized system LUNOS by the company itself is a new patent and does not require recovery. It is easy to use and at cost of 2700Euro much cheaper than a ventilation system with heat recovery, such as by the company Vallox. By the company Vallox a fully electronic development and ventilation system is priced at 7500Euro our construction company. It included a huge control box, for example, in the laundry room takes away a lot of space. In addition, the user of this electronic system also very large (you can look on the internet). Then we have
planned to purchase cheap electricity from the company "Energiegut. This paper shows
The attached photo the result of the earthworks from home from the 2 Ausgustwoche 2010th

Wednesday, August 4, 2010

Poptropica Where To Go On The Motorbike

In OA, the inner walls finished


Since 2 weeks we are waiting on our wood for the roof. The interior walls are finished and the walls only deducted once, since that can not make more before the roof is directed.
Tomorrow is the day, the roof is made. By context, we will celebrate our morning then topping. We are looking forward on it huge.
plays Hopefully with the weather. We
certainly hope that such a long break no longer occurs. Thomas has ever made in the meantime the electrics on. The chimney, he has also been bricked up top.