Monday, April 26, 2010

Arrow Spine Tester Blueprints

Prepared measures

The current status is that we will now begin to prepare the. Next week we will be backfilled with compacted soil and our property. Since our semi-detached partner, unfortunately, still does not have the permission we must have patience, we hope that the problem will do this week.
That annoys us quite doll that we have to wait.
We have our permission long ago but we can not still enjoy it.
In the next few days we get the remaining documents, such as static, heat insulation and sound-proof protection. These documents, we have to hand over the building authority so that the start of construction, nothing more stands in way.
we are currently jeopardizing all the documents together for our building surveyor, as he needed for this preparation. Once
with us is something new we will tell you. We hope that soon times positive continues. We've been waiting so long for the start of construction.

Dezonage Sony Dvp-sr200

land transfers

Last week we had the official appointment with the SER for land transfers.
The appointment was done very quickly and unspectacular. Now we are the new owners of the property.
one step further, I hope it starts soon. Time is running!

Sunday, April 4, 2010

Why Women Commit Abortion Thesis

Open information meeting of the assembly Suedwestsonne

for our project in the Scharnweberstraße we have examined in November 2009 various facade variants of a simple working model and discussed with the client. While the support structure will be a reinforced concrete frame, the exterior facade will be created in lightweight timber construction. This we achieve with very low component costs and very high insulation wall thickness for the desired low energy house standard. The building will meet the eligibility criteria "KfW70" (equivalent to the standard 55 to the old ENEV KfW). Overall, placed on a sustainable and resource conserving design is strongly encouraged. In the 2nd, 3rd 4th floor and are to forgive is still apartments. For more project information see: www.suedwestsonne.de