Monday, April 26, 2010

Arrow Spine Tester Blueprints

Prepared measures

The current status is that we will now begin to prepare the. Next week we will be backfilled with compacted soil and our property. Since our semi-detached partner, unfortunately, still does not have the permission we must have patience, we hope that the problem will do this week.
That annoys us quite doll that we have to wait.
We have our permission long ago but we can not still enjoy it.
In the next few days we get the remaining documents, such as static, heat insulation and sound-proof protection. These documents, we have to hand over the building authority so that the start of construction, nothing more stands in way.
we are currently jeopardizing all the documents together for our building surveyor, as he needed for this preparation. Once
with us is something new we will tell you. We hope that soon times positive continues. We've been waiting so long for the start of construction.

0 comments:

Post a Comment