base plate
Wednesday made the strip foundations ready.
Last Thursday came the concrete for our base. Mürmann before the Lord, our Surveyors, the probation has decreased the base. He looked at everything carefully and has the ok, given for the concrete, we were very happy about it. Before and after concrete was all well watered, as it otherwise at the temperatures can dry out too quickly, that would not be as good as the concrete cracks usually fast. As a precaution, the workers have covered the finished concrete moist. So that nothing can go wrong! This weekend we went to look for on the spot that everything is still wet enough. Everything was ok.
0 comments:
Post a Comment