We have now started in the attic with filling and sanding (use putty on the edges of the sheet-rock) and are thus also become almost finished. To this end we lift our construction still twice a day. The Bautrockner we have returned after 2 weeks to the landlord (a photo of the building dryer with 2 wheels you see above). In addition, we have turned the attic stairs. It was built by the carpentry, according to the plans properly. But we felt that as a security risk if the wooden stairs opened in the direction of the Hauptreppe is (and is between the end of the main staircase and the start of the roof hatch stairs just 30cm apart). If one as the wooden stairs from the attic and climb back down you're not careful, then one can easily fall down the main staircase. Thus, we have turned the loft staircase so that it is opened in the direction of the bedroom (ie a rotation of 180 degrees). Unfortunately we have found that when filling and sanding still building defects, such as cracks in a concrete wall in the attic and misplaced Sheetrock also DG. These shortcomings, we still need to complain to the supervisor.
Finally, the above series of photos you can see two photos of the current state of our bathroom (bath veiled mit grünen Rigpsplatten)
Dazu haben wir noch unsere Erdwärmepumpe fotographiert (die weiße Säule) und einen Verwandten in blauer Latzhose, der uns beim Schleifen der Wände (beim Abschleifen der getrockneten Spachtelmasse) geholfen hat. Die weißen Sprossen (die kleine Sprossewand) unter der Folie stellen unsere Handtuchheizung im Bad (im DG) da.