Tuesday, December 7, 2010

Easy Chocolate Cookie

snow break at the Thomsen


Baupause!
currently prevails in our building, unfortunately, snow and Baupause. The continuation of the filling work had to be postponed because of the high snow volume. But we have already household electricity in our house (and a current monitor). The water supply in our house but not before January set 2011th
in our house since we have high humidity and it is there has become quite cold, we have heaters in the house at the time (small electric heaters) set up and run also 2 Bautrockner continuously to warm up the house and dried. The Luftfeuchttigkeit in our house is immense. We have already condensed water on our windows. For this reason, we have established now rented building dryer that will dry out the house for a period of 2 weeks. The heaters are turned off on 13.12.2010, as on this day to our first floor Time is put into operation.
Finally we lift our house right now every day at least 2 times (only airing) so that the moisture passes out of our house (and relieve the Bautrockner something).

0 comments:

Post a Comment