Wednesday, March 2, 2011

Denise Millani Bra Size

Again tree protection / demolition existing building

Yesterday we got a letter from the Tree Protection Officer. It was his opinion for the proposed tree felling. 3 of the trees being felled are "departures" and may be made without replacement planting. For 3 more trees we have to substitute plant on our property. These three trees have a value of about 1900 € and should, for example by planting of two pine forest, a bird cherry, a wood apple and some wild rose bushes be replaced. The newly planted trees are to approximately 2-2.5 m in size, and a trunk circumference of at least 15 cm have. By the end of April, we shall provide a open space plan, in which we must enter the new plantations with details of type and location. should then be planted by the end of October this year. We will definitely not create, as we will be stuck at the moment right in the interior of our house. The tree felling, we may perform only once the planning application was approved.
do in the next week we are currently on the property remaining buildings (gazebo and small Abstellhütte) tear. Thus, we have then room for the tree felling. Let us hope that the approval of our building application is not delayed too long. There were two additional claims made by our architect, Mr. B., has already filed later. It was a chart of vervorgeht that sufficient water for fighting with us in case, would be available. The statics can be submitted only shortly before construction begins, as finger-house this final only after the samples can be calculated.

0 comments:

Post a Comment